Suzhou Jiuwei Electric Furnace Equipment Co., Ltd. has a special view on the resistance furnace to accelerate the structural adjustment to win the market
According to "72007", ×00 times implies the design temperature of the resistance furnace. The roller passes through the furnace lining and the furnace shell, and is supported by a sealed bearing outside the furnace shell. Class C furnaces should be equipped with a micro processor digital display temperature controller with a temperature setting accuracy not less than% and resolution not less than. This address is decoded to select one of the analog inputs to the fighting machine. cs: Chip select terminal, input,. 6 Set parameters: Press and connect seconds to enter parameter setting. First display the i button to add and reduce parameter values. Press to confirm the setting value and display the next parameter. Make sure all the parameters are set correctly, and then exit the parameter setting status. According to the research in the literature [4] [], the trance controller is essentially an interpolator. Whether the response function obtained by interpolation is sufficiently close to the true response function depends on whether the distance between the centers of the trance set is sufficiently small. It means that a lot of restraint rules are required.
The silver paint of the resistance furnace must be kept intact and painted ~2 times a year to reduce the radiant heat loss of the furnace. 9. There is a φ00 hole on the top of the heat preservation cover for the preheating of the electrode blanks. After the dummy electrode is located on the top of the heat preservation cover and fixed, the hole must have a movable heat preservation assembly. The spi download interface and the jag debugging interface are the extended interface circuits for realizing the system's software upgrading and online function debugging. 719 and b8955 reheating line conversion should be tempered according to g39g5
Do not forcibly increase the temperature of the resistance furnace, or even burn the furnace wire. Frequently check the heating wire. If there is contact between the two wires, separate them in real time. Through temperature detection and transmission, the furnace temperature signal t becomes an electric signal, which compares with the temperature setting value, calculates the temperature error e and the transition rate de/dt of the temperature error, and then performs the intelligent control algorithm Reasoning and obtaining the control quantity u, the SCR output department adjusts the output power of the electric heating furnace according to the regulation, that is, changes the switching time of the SCR tube to make the electric heating furnace. Extraordinary circumstances are negotiated between the supply and demand parties (see. It is generally considered that the pure lag time, the frequency of the time constant t of the object is greater than ., then the process is called a large lag process. If there are two close, medium distance Electrodes that are separated from the inevitable gap will have a dazzling white flame when energized. Resistance furnace manufacturer
Enterprise WeChat | Mobile site |
Contact number: 15850376426
18994301658
Wang Wang ID: jwdianlu
Telephone: 0512-65431779
Website: www.szjwdl.cn
Address: No. 3302, Chengyang Road, Weitang Town, Xiangcheng, Suzhou