》》》》》TRQ type gas stove
1. Scope of application: all furnace types;
2. Selection reference: natural gas;
3. Equipment advantages: reduce the cost of use;
4. Equipment supporting: heating furnace, natural gas pipeline, burner;
5. Equipment structure: channel steel, pipeline, A3 steel plate, energy-saving insulation cotton, touch screen, PLC, stainless steel SUS304/310, refractory brick, burner, control electric cabinet.
The XR gas furnace is similar to other resistance furnaces. The heating source is natural gas and other gaseous media. The burners are heated by high-speed burners. The burners are evenly arranged. The proportion of mixed air and gas is adjusted by the proportional valve to fully burn. The gas pipe of each burner is equipped with a control solenoid valve, and each burner is equipped with an independent and complete combustion controller and ignition transformer. It has automatic ignition, flame detection, fire extinguishing alarm, automatic gas shutoff, etc., and a safety air pipeline is installed Explosion-proof device.
》》》》》TRQ Type Gas furnace
1. Scope of application: All furnaces;
2. Selection reference: Natural gas;
3.Economical and practical: Reduce the cost of use;
4. Equipment matching: Heating Furnace, Natural Gas Pipeline, Burner;
5.Equipment structure: Channel steel, pipeline, A3 steel plate, energy-saving insulation cotton, touch screen, PLC, stainless steel SUS304/310, firebrick, burner, control cabinet。
6,技术参数:(Technical Parameter)
1 | 功率(Power) | 《3000KW |
2 | 电压(Voltage) | 380V |
3 | 工作温度(Working temperature) | 《1050℃ |
4 | 控温区段(Temperature control section) | 1—10区(Area) |
5 | 控制精度(Control accuracy) | ±1℃ |
6 | 外壳温度(Shell temperature) | 《室温(Room temperature)+30℃ |
7 | 生产量(Output) | 《50T/24h |
7. Ex-factory inspection standards:
Factory inspection items: general inspection of manufacturing quality; safety inspection; inspection of working dimensions; quality inspection of furnace lining; inspection and measurement of heating element manufacturing quality and cold DC resistance; equipment appearance, equipment main dimensions, cold parameters, and use Material inspection; inspection of the sensitivity of various alarm reactions in working status; check whether the spare parts and spare parts are complete; pipeline leak detection test; accessory parts inspection, including model, specification, etc.
8, material:
Serial number | name | quantity | Remark |
1 | Basic plan | 1 | Provided after signing the contract. |
2 | List of materials required for installation | 1 |
3 | Electrical schematic diagram | 1 | Provided when shipped. |
4 | Instrument manual | 1 |
5 | Operating procedures | 1 |
6 | Packing and shipping list | 1 |